Presenting The Octopus’ Garden

True to Style Architecture in a Unique Florida Custom Home Designed as a family retreat this four thousand square foot home is full of character and charm. The project drew its inspiration from the stilt houses of Charlotte Harbor. These homes were really fishing shacks with the bare essentials to keep a group happy and

Indian Beach : Pool, Interior Framing, Windows and Rough Ins!

We've made tremendous progress on this project since our last update and we're excited to share with you. Follow along as we build Sarasota's luxury homes. Our last update was at roof dry in and there has been huge progress on this project since then. Interior framing is about 90% complete, mechanical rough ins have

By |2018-10-01T13:35:03+00:00September 20th, 2018|Architecture, Blog, Under Construction|

Villa Azure: Second Floor Ledgers and Trusses

This New Custom Home Now Has A Second Floor Our masonry crew has poured the first level beams and columns and stripped forms and for the time being the framing crew will be taking over installing and then shoring the floor system that the masons will lay up second level block work from. This new

By |2018-10-01T13:28:28+00:00September 19th, 2018|Architecture, Blog, News, Under Construction|

Indian Beach: Second Floor Block Work

We've moved right from installing the floor system and sheathing it to putting up the second floor block walls! Thank you for following along on on our Sarasota new construction blog. We hope to give everyone a glimpse into how these projects come together for our clients. We've had a busy couple of weeks going

By |2018-07-13T20:35:54+00:00July 13th, 2018|Architecture, Blog, Uncategorized, Under Construction|

Indian Beach: Trusses installed. Floor Sheathed. Block Stocked

Building a new custom home doesn't get much quicker than this As soon as tie beams set up we had forms stripped and our carpentry crew was on site to take delivery of our floor trusses and begin installing ledgers. On our projects we install J bolts for our ledgers rather than drill each ledger

By |2018-07-05T21:36:32+00:00July 5th, 2018|Architecture, Blog, Under Construction|

Indian Beach: Tie Beams and Poured Decks

After weeks of putting forms in place and bending steel today we poured first level tie beams and second level elevated concrete decks on this waterfront home The rains have tried unsuccessfully to slow our progress on this waterfront home. As of today we are pouring beams exactly according to our schedule thanks to careful

By |2018-06-21T14:53:33+00:00June 20th, 2018|Architecture, Blog, Uncategorized, Under Construction|
Load More Posts