Indian Beach : Pool, Interior Framing, Windows and Rough Ins!

We've made tremendous progress on this project since our last update and we're excited to share with you. Follow along as we build Sarasota's luxury homes. Our last update was at roof dry in and there has been huge progress on this project since then. Interior framing is about 90% complete, mechanical rough ins have

By | 2018-09-20T18:46:19+00:00 September 20th, 2018|Architecture, Blog, Under Construction|

Villa Azure: Second Floor Ledgers and Trusses

This New Custom Home Now Has A Second Floor Our masonry crew has poured the first level beams and columns and stripped forms and for the time being the framing crew will be taking over installing and then shoring the floor system that the masons will lay up second level block work from. This new

By | 2018-09-19T21:42:16+00:00 September 19th, 2018|Architecture, Blog, News, Under Construction|

Indian Beach Roof Trusses and Dry In

Roof Trusses and Dry In Are Complete Building Sarasota luxury custom homes in the summer has its challenges and one of the best ways to overcome those challenges is to get under roof as quickly as possible. The other challenge is keeping material fresh and safe from environmental factors such as rain and sun as

By | 2018-09-05T14:25:05+00:00 August 31st, 2018|Uncategorized, Under Construction|

Indian Beach: Second Floor Block Work

We've moved right from installing the floor system and sheathing it to putting up the second floor block walls! Thank you for following along on on our Sarasota new construction blog. We hope to give everyone a glimpse into how these projects come together for our clients. We've had a busy couple of weeks going

By | 2018-07-13T20:35:54+00:00 July 13th, 2018|Architecture, Blog, Uncategorized, Under Construction|

Villa Azure: First Floor Slab Pour

Its time to move into vertical structure on this unique piece of Sarasota architecture Its time to move into vertical structure on this unique piece of Sarasota architecture. Yesterday our team arrived on site bright and early to pour the first living level in this unique piece of Sarasota architecture. This was a unique slab

By | 2018-07-13T18:15:13+00:00 July 13th, 2018|Blog, News, Under Construction|

Indian Beach: Trusses installed. Floor Sheathed. Block Stocked

Building a new custom home doesn't get much quicker than this As soon as tie beams set up we had forms stripped and our carpentry crew was on site to take delivery of our floor trusses and begin installing ledgers. On our projects we install J bolts for our ledgers rather than drill each ledger

By | 2018-07-05T21:36:32+00:00 July 5th, 2018|Architecture, Blog, Under Construction|